Chief PFB2UB User Manual
Displayed below is the user manual for PFB2UB by Chief which is a product in the Signage Display Mounts category. This manual has pages.
Related Manuals
I N S T A L L A T I O N I N S T R U C T I O N S
Single and Dual Bolt Down Floor Stands
PFB1UB/PFB2UB
PFB1UB/PFB2UB Installation Instructions
2
DISCLAIMER
Milestone AV Technologies, and its affiliated corporations and
subsidiaries (collectively, "Milestone"), intend to make this
manual accurate and complete. However, Milestone makes no
claim that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Milestone
makes no representation of warranty, expressed or implied,
regarding the information contained herein. Milestone assumes
no responsibility for accuracy, completeness or sufficiency of
the information contained in this document.
Chief® and ClickConnect™ are registered trademarks of
Milestone AV Technologies. All rights reserved.
DEFINITIONS
MOUNTING SYSTEM: A MOUNTING SYSTEM is the
primary Chief product to which an accessory and/or component
is attached.
ACCESSORY: AN ACCESSORY is the secondary Chief
product which is attached to a primary Chief product, and may
have a component attached or setting on it.
COMPONENT: A COMPONENT is an audiovisual item
designed to be attached or resting on an accessory or mounting
system such as a video camera, CPU, screen, display,
projector, etc.
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voiding of factory warranty! It is the
installer’s responsibility to make sure all mounting systems
are properly assembled and installed using the instructions
provided.
WARNING: Failure to provide adequate structural strength
for this mounting system can result in serious personal injury
or damage to equipment! It is the installer’s responsibility to
make sure the structure to which this mounting system is
attached can support five times the combined weight of all
equipment. Reinforce the structure as required before
installing the mounting system.
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the combined weight of
all accessories and components attached to the stand does not
exceed 150 lbs (68 kg) for the PFB1UB, 250 lbs (113.4 kg) for
the PFB2UB [125 lbs (56.7 kg) per faceplate].
WARNING: Do NOT install PFB1UB/PFB2UB mounts to
any surface other than concrete! Concrete flooring must be at
least 4" in thickness and NOT be covered with any other type
of flooring material. Concrete anchors must be installed
directly into concrete surface.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a service center for
examination and repair.
WARNING: Do not use this mounting system outdoors.
WARNING: RISK OF SERIOUS INJURY OR DEATH!
Placing a remote control or toy on the stand may encourage
a child to climb onto the stand causing the stand to tip over
onto the child. DO NOT place remote controls or toys on the
stand!
WARNING: RISK OF SERIOUS INJURY OR DEATH!
Relocating audio and/or video equipment to the stand may
result in the stand collapsing or overturning onto a child. DO
NOT relocate audio and/or video equipment to the stand!
NOTE: The PFB1UB and the PFB2UB Series floor stands
have no user serviceable parts.
--SAVE THESE INSTRUCTIONS--
Installation Instructions PFB1UB/PFB2UB
3
DIMENSIONS
PFB1UB
PFB2UB
Installation Instructions PFB1UB/PFB2UB
4
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips Screwdriver
Destornillador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Clé à fourche
By Hand
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
Hex-Head Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Zeskantsleutel
Clé à tête hexagonale
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Adjust
Ajustar
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Remove
Quitar
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Optional
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
PFB1UB/PFB2UB Installation Instructions
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
3/16"
(included)
1/4"
(To remove base
plates from packaging)
K (1)
A (1)
B (4)
C (4)
D (1)
F (1)
G (4)
H (1)
J (1)
5/16-18 x 1/2" M (4)
5/16-18 x 3/4" N (4)
5/16-18 x 1-1/2"
Q (4)
5/16"
3/16"
3/16"
L (12)
1/4-20 x 3/8" P (1)
1/4"
(Front)
(PFB2UB Only)
D1 (1)
[PF Head Assemblies]
[Base plate]
3/8 x 3" concrete anchor
5/16-18 x 1 1/2"
E (1/2)* - PSBU interface + hardware and
installation instructions
[7" column]
[Column cover]
*-1 for PFB1UB, 2 FOR PFB2UB
(pictured assembled)
PFB1UB/PFB2UB Installation Instructions
6
ASSEMBLY
CAUTION: Attachment holes may be damaged if a power
drill is used to insert button head cap screws. Screws should
first be inserted and turned BY HAND with the hex key or with
a handheld screwdriver BEFORE using the hex head drill bit
and power drill to complete the attachment.
Assembling Base Plate to Column
CAUTION: INNER AND OUTER COLUMNS ARE
SHIPPED TAPED TOGETHER. After tape is removed the
inner column will be disengaged and may pinch hands!
CAUTION: Remove tape while CAREFULLY holding
both inner and outer columns in place.
IMPORTANT ! : Press cable tie tab to loosen and
remove cable tie from around knob post. (See Figure 1)
NOTE: Disengage knob on center post BEFORE attaching
base to center post.
1. Lift up slightly on the inner column of center post and hold
firmly toward top of post. (See Figure 1)
2. Pull out knob on the center post and turn 90° in either
direction to disengage the locking mechanism. (See
Figure 1)
3. Raise the inner column and turn the knob 90° in either
direction to engage the knob and lock the column in place.
(See Figure 1)
Figure 1
4. Attach base plate (A) to the center post (F) using four 5/16-
18 x 1-1/2" flat head cap screws (C) and four 5/16" flat
washers (Q). (See Figure 2)
Figure 2
inner column
Cable
Tie
(F)
(Front)
4
(C) x 4
(Q) x 4
Installation Instructions PFB1UB/PFB2UB
7
Ataching Base Plate to Floor
1. Using bolt down plate (A) as a template, mark four holes at
outside hole locations for each column. (See Figure )
WARNING: Do NOT install PFB1UB/PFB2UB mounts to
any surface other than concrete! Concrete flooring must be at
least 4" in thickness and NOT be covered with any other type
of flooring material. Concrete anchors must be installed
directly into concrete surface.
IMPORTANT ! : See Bolt Down Dimensions on page 3 to
measure distances between each bolt down plate.
IMPORTANT ! : Make sure columns will be installed far
enough away from any walls so that displays may be
installed.
2. Using a 3/8” drill bit, drill a hole 3 1/2” in depth at each
marked location. (See Figure 3) and (See Figure 4)
3. Blow each hole clean of any concrete debris with a large air
hose or compressed air in a can. (See Figure 4)
IMPORTANT ! : Do NOT modify the anchors or advance
the bolt in the anchors prior to installation!
4. Place each base plate (A) on top of drilled holes making
sure holes on plate are aligned with drilled holes. (See
Figure 4)
5. Use a hammer to drive 3/8 x 3" concrete anchors (B)
through plate holes into the drilled holes until the bolt head
is firmly seated against the plate. (See Figure ) and (See
Figure 4)
6. Tighten each anchor by turning the head three to four turns
past finger tight. (See Figure 4)
Figure 3
Figure 4
Attaching Single Head Assembly (PFB1UB)
IMPORTANT ! : When attaching head assembly ensure
that the ClickConnect lock is at TOP of head assembly,
and bracket tabs slide into the stand assembly. (See
Figure 5)
1. Slide head assembly (D) into the stand assembly. (See
Figure 5)
2. Attach head assembly to stand using four 5/16-18 x 3/4"
button head cap screws (M). (See Figure 5)
Figure 5
12
3/8”
6
(B) x 4
5
(A)
2
3/8”
3 1/2” deep
3
air hose
(U) x 4
5
(LL)
(U) x 4
6
(LL)
(M) x 4
(Back view of stand)
ClickConnect
lock at TOP of
head assembly
Bracket Tabs
Stand
Assembly
(D)
2
1
PFB1UB/PFB2UB Installation Instructions
8
Attaching Dual Head Assembly (PFB2UB)
IMPORTANT ! : When attaching front head assembly
ensure that the ClickConnect lock is at TOP of head
assembly, and bracket tabs slide into the stand assembly.
(See Figure 5)
1. Slide front head assembly (D) into the stand assembly.
(See Figure 6)
2. Place back head assembly (D1) on the back of the stand
assembly, and on top of the front head assembly. (See
Figure 6)
3. Use four 5/16-18 x 3/4" button head cap screws (M) to
fasten through both head assemblies. (See Figure 6)
Figure 6
4. Fasten through back head assembly (D1) and back of stand
assembly using one 1/4-20 x 3/8" button head cap screw (K)
and one 1/4" washer (P). (See Figure 6)
Adjusting Stand Height
CAUTION: ALWAYS remove the display(s) BEFORE
adjusting the height of stand.
1. Firmly grasp head assembly. (See Figure 7)
IMPORTANT ! : To avoid pinching hands, hold head
assembly when adjusting stand height.
Figure 7
2. Adjust the stand to the desired height by slightly lifting the
head assembly, pulling out knob on the center post and
turning 90o in either direction to disengage the locking
mechanism. (See Figure 8)
3. Raise or lower the center post, then turn the knob 90o either
direction to engage the knob and lock the stand at desired
height. (See Figure 8)
Figure 8
IMPORTANT ! : Set the height of the stand so the display
does NOT rest on the lower part of the center post.
(See Figure 8) Always set the height so the knob is
engaged in a hole in the center post.
1
2
4
3
(M) x 4
(K) x 1
(P) x 1
Back of stand
(D)
(D1)
Grasp head assembly
within shaded area.
Do NOT let
display rest
here
23
Inner
Column
Installation Instructions PFB1UB/PFB2UB
9
Attaching Display to Stand
WARNING:
Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the combined weight of
all accessories and components attached to the stand does not
exceed 150 lbs (68 kg) for the PFB1UB, 250 lbs (113.4 kg) for
the PFB2UB [125 lbs (56.7 kg) per faceplate].
CAUTION: Before attaching display(s) to the stand ensure
the stand is on level surface.
CAUTION: ALWAYS remove the display(s) BEFORE
adjusting the height of the stand.
1. Attach PSBU interface bracket(s) (E) to the display(s)
following the instructions included with the bracket.
2. While supporting both sides of display, align four mounting
buttons on display or interface bracket with four mounting
holes in head assembly. (See Figure 9) and (See Figure 10)
Figure 9
WARNING: EACH DISPLAY MAY WEIGH IN EXCESS OF
40 LBS! Always use two people and proper lifting techniques
when installing or positioning display on stand.
3. Lower display into place listening for audible "click" to
ensure recessed area of mounting buttons are properly
seated in lower area of mounting holes.
(See Figure 9) and (See Figure 10)
WARNING: IMPROPER INSTALLATION CAN LEAD TO
STAND OR DISPLAY FALLING CAUSING SERIOUS
PERSONAL INJURY OR DAMAGE TO EQUIPMENT!
Ensure mounting buttons are completely engaged in
mounting holes.
NOTE: Holes are provided in the faceplate for use with a
padlock or similar locking device, if desired. In addition,
the pin and nut may be removed from the upper holes
and moved to the lower holes for use as a more
permanent locking device. (See Figure 10)
Figure 10
Tilting Display
The display(s) can be tilted up to 15o either backward or
forward from a straight upright position. In a dual stand, the
tilting is only restricted by the size of the display.
1. Turn knob counterclockwise on back of head assembly to
loosen the tilt. (See Figure 11)
Figure 11
2. Tilt display as desired, to a maximum of 15o either forward
or backward.
3. Turn knob clockwise to tighten display on head assembly.
(See Figure 11)
CAUTION: Tighten knob on back of head assembly to
prevent damage to the stand.
4. If leaving the display in a straight upright position, it is
recommended that a bolt (not provided) be placed through
the head assembly (See Figure 11) to lock the display into
the upright position.
2
3
3
2
Remove pin
and nut and
move to lower holes
A padlock or bolt may
be placed through latch
holes
13
4
Place optional bolt
(not provided) here
to lock in an upright
position.
PFB1UB/PFB2UB Installation Instructions
10
Cable Management
1. Signal cables can be run down the front flap of the center
post and out the front of the post at any of the openings.
(See Figure 12)
2. The display power cord can be run through the top and
down through the post to exit out the back. (See Figure 12)
3. Any accessory power cords can be run through the front
and down through the post to exit out the back. (See Figure
12)
4. Install the snap-on covers to any opening that is not being
used. (See Figure 12)
5. To remove the snap-on covers, grip the sides of the cover
in the middle and pull off. They can also be removed by
inserting a flat-blade screwdriver into the bottom slot and
prying them off.
Figure 12
Removing Display(s) from Stand
1. Remove bolt or padlock from faceplate (if used).
NOTE: The pin may have been used as a more permanent
locking device. If so, remove nut and pin and move
from the lower holes to the upper holes.
2. Pull back on flag on upper mounting hole and press pin
down into "Open" position. (See Figure 13)
WARNING: EACH DISPLAY MAY WEIGH IN EXCESS OF
40 LBS! Always use two people and proper lifting techniques
when installing or positioning display on stand.
3. Carefully lift display(s) from stand.
4. Lift up on pin and place flag back against faceplate to return
it to "Closed" position.
Figure 13
1
2
3
Exits for
signal cables
Snap-on
covers
Exit for
power
cables
(Front view
of center post)
(Rear
view of
center post)
2
1
Remove bolt
or padlock
if used
Pin in
"Open"
position -
Pin in
"Closed"
position -
4
move to
"Open"
position to
move to
"Closed"
position
remove
display
after display
is removed.
2
1
4
Installation Instructions PFB1UB/PFB2UB
11
USA/International A 6436 City West Parkway, Eden Prairie, MN 55344
P800.582.6480 / 952.225.6000
F877.894.6918 / 952.894.6918
Europe A Franklinstraat 14, 6003 DK Weert, Netherlands
P+31 (0) 495 580 852
F+31 (0) 495 580 845
Asia Pacific A Office No. 918 on 9/F, Shatin Galleria
18-24 Shan Mei Street
Fotan, Shatin, Hong Kong
P852 2145 4099
F852 2145 4477
PFB1UB/PFB2UB Installation Instructions
Chief, a products division of
Milestone AV Technologies
8800-003078 Rev01
2018 Milestone AV Technologies
www.milestone.com
07/18