Chief SLM194 User Manual
Displayed below is the user manual for SLM194 by Chief which is a product in the Projector Accessories category. This manual has pages.
Related Manuals
INSTALLATION INSTRUCTIONS
CSAV, Inc., and its affiliated corporatio ns and subs id iaries (collectiv ely, "CSAV"), inte nd to mak e this manual ac curate and complete. However, CSAV m ake s no claim that the infor-
matio n contai ned her ein cove rs all detai ls, c onditio ns or vari ations, nor do es it provide f or ev ery possibl e cont ingency i n conne ction with t he ins tallatio n or use of th is produc t. The
information contained in this document is subject to change without noti ce or obligation of any kind. CSAV makes no representation of warranty, expressed or implied, regarding the
information contained herein. CSAV assumes no responsibility for accuracy, completeness or sufficiency of the i nformation contained in this document.
© 2007 Chief Manuf acturing, 8401 Eagle Creek Parkway, Savage, MN 55378
• P: 800.582.6480 / 952.894.6280 • F:877.894.6918 / 952.894.6918
8802-000263 RevA
8/10/07
SLB-194 and SLM-194 Inter face Brackets
for MITSUBISHI SD105U, XD206U, XD206U-G
SLB and SLM series Interface brackets are designed for use with Chief RPA, RPM, and Smart-Lift series projector mounts. See the specific
installation instructions provided with the mount for additional installation information.
Unpack carton and verify kit contents. If any listed parts are missing, immediately contact a Chief Customer Service representative by calling
1-800-582-6480.
WARNING: IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY AND
DAMAGE TO EQUIPMENT! DO NOT substitute hardware. Use only hardware supplied by manufacturer!
Installation:
WARNING: OVERTIGHTENING OF SCREWS CAN DAMAGE PARTS AND LEAD TO SERIOUS PERSO NAL INJURY AND DAMAGE
TO EQUPIMENT! DO NOT over tighten screws when installing interface brackets.
NOTE: Step 1 is only required when installing an SLB Interface bracket. If an SLM bracket is being installed proceed to step 2.
1. Screw four thumb screws onto four 10-24 x 5/8" Philips pan head screws. DO NOT fully tighten thumb screws at this time.
2. Turn projector upside down on a flat surface.
3. Place the interface bracket onto the bottom of the projector lining up the three holes in the bracket with the three threaded inserts in the
bottom of the projector.
4. Plac e the M4 X 8mm mou nting sc rews a nd washer s ( two was hers may b e neede d o n each sc rew) and st art t hem int o th e mount ing h ole s
by hand, secure all three fasteners at this time.
NOTE: Securi ty scre ws can be s ubsti tuted whe n mount ing Inter fac e bracket to projec tor by us ing the p arts and ins tall ation instruct io ns i n th e
All-Points Se curity Kit.
(1) Interface Bracket (3) Screw, Pan Head, M4 x 6mm
( 4) 10 -24 Thumb N uts ** (6) Washer, Flat, M4
(1) All- Poin ts Securit y Kit
**Only used when installing SLB Interface brackets.
SLB-194 SLM-194
Towards front of Towards front of
Projector
Projector
Lamp Access Lamp Access