Chief TIL1X2IFJ User Manual
Displayed below is the user manual for TIL1X2IFJ by Chief which is a product in the Signage Display Mounts category. This manual has pages.
Related Manuals
INSTALLATION INSTRUCTIONS
TILVAB1 Accessory
TIL1X2IFJ
TIL1X3IFJ
TIL1X4IFJ
IFJ Series LED Wall Mounts / Accessory
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/
TILVAB1
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
2
DISCLAIMER
Legrand | AV and its affiliated corporations and subsidiaries
(collectively “Legrand | AV”), intend to make this manual
accurate and complete. However, Legrand | AV makes no claim
that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Legrand | AV
makes no representation of warranty, expressed or implied,
regarding the information contained herein. Legrand | AV
assumes no responsibility for accuracy, completeness or
sufficiency of the information contained in this document.
Chief® is a registered trademark of Legrand AV Inc.
DEFINITIONS
MOUNTING SYSTEM: A MOUNTING SYSTEM is the
primary Chief product to which an accessory and/or component
is attached.
ACCESSORY: AN ACCESSORY is the secondary Chief
product which is attached to a primary Chief product, and may
have a component attached or setting on it.
COMPONENT: A COMPONENT is an audiovisual item
designed to be attached or resting on an accessory or mounting
system such as a video camera, CPU, screen, display,
projector, etc.
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voiding of factory warranty! It is the
installer’s responsibility to make sure all mounting systems
are properly assembled and installed using the instructions
provided.
WARNING: Failure to provide adequate structural strength
for this mounting system can result in serious personal injury
or damage to equipment! It is the installer’s responsibility to
make sure the structure to which this mounting system is
attached can support five times the combined weight of all
equipment. Reinforce the structure as required before
installing the mounting system. The wall to which the
mounting system is being attached may have a maximum
drywall thickness of 5/8” (1.6cm).
WARNING:
The TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ LED
wall mounts are designed for use with LED panels only.
Exceeding the weight capacity (listed) can result in serious
personal injury or damage to equipment!
• TIL1X2IFJ: 60 lbs (27.2 kg) - 30 lbs (13.6 kg) per
screen;
• TIL1X3IFJ: 90 lbs (40.8 kg) - 30 lbs (13.6 kg) per
screen;
• TIL1X4IFJ: 120 lbs (54.4 kg) - 30 lbs (13.6 kg) per
screen.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a service center for
examination and repair.
WARNING: Do not use this mounting system outdoors.
IMPORTANT ! : The TIL1X2IFJ / TIL1X3IFJ /TIL1X4IFJ LED
wall mounts are designed to be mounted to:
• a bare 8" concrete or 8"x8"x16" concrete block wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
• a 3/4" thickness plywood-backed, steel stud wall
covered with drywall having a maximum thickness of
5/8".
NOTE:
Go to
https://www.legrandav.com/resources/
product_videos?v=Chief_TiLED_LED_Video_Wall
_Mounting_System_Installation
toviewan
introductiontoinstallingChiefTiLEDMounting
Systems.
--SAVE THESE INSTRUCTIONS--
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
3
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips Screwdriver
Destornillador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Clé à fourche
By Hand
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
Hex-Head Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Zeskantsleutel
Clé à tête hexagonale
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Adjust
Ajustar
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Remove
Quitar
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Optional
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
4
TABLE OF CONTENTS
DISCLAIMER .........................................................................................2
DEFINITIONS ........................................................................................2
IMPORTANT SAFETY INSTRUCTIONS ..............................................2
LEGEND ................................................................................................3
TABLE OF CONTENTS .........................................................................4
TOOLS REQUIRED FOR INSTALLATION ............................................5
PARTS ...................................................................................................5
PRE-INSTALLATION .............................................................................6
Site Assessment ........................................................6
INSTALLATION .....................................................................................7
Adding Vertical Connector Kit ....................................7
If Starting LED Wall Installation With the Top Row.....7
If Starting LED Wall Installation With the Bottom Row7
Preparing LED Cabinet ..............................................8
Assessing the Installation Site ...................................8
Installing First Mount ..................................................8
Adding Additional Mounts ..........................................11
Checking Placement and Alignment ...........................13
Connecting Mounts Above or Below First Row .........15
APPENDIX .............................................................................................16
Fastener Installation Methods ...................................16
Wood Stud ...........................................................16
Concrete or Concrete Block .................................16
Steel Stud .............................................................16
Site Requirements for Wood/Steel Stud Installation....18
DIMENSIONS .........................................................................................19
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
5
TOOLS REQUIRED FOR INSTALLATION
PARTS
Hardware Required - not included
(for installation into steel stud walls)
1. Chief brand FCAT1 Toggler Kit; OR
2. Hardware for installation to steel stud wall:
• 1/4-20 Toggler Snaptoggle BB (Qty 4)
•1/4-20 x 2-1/2" hex head bolt (Qty 4)
• 1/4" washer (Qty 4)
7/32"
#2, #3
Level
[2 ft. long]
[Small level]
3/8"
1/2"
square drive
[4+ ft. long]
[6+ ft. long]
Bright colored
string
Additional Suggestions
1. Dead blow hammer
2. Masking tape
3. Offset screwdrivers
4. Ratcheting wrenches
5. Laser level
6. Tools required for LED
panels installation.
Most likely metric.
3/4" (19mm)
ratcheting wrench
deep well socket
A (1)
[Adjustment
washer-RIGHT]
C (4)
[UX10x60R D (4)
5/16 x 2-1/2"
E (4)
5/16"
anchor]
B (1)
[Adjustment
washer-LEFT]
Mounting Hardware Kit
F (4)
#10 x 1/2" G (8)
10-24 x 1" H (8)
1/4-20 x 1/2"
OR OR
J (1)
TIL1X4IFJ
J (1)
TIL1X2IFJ
J (1)
TIL1X3IFJ
L (2)
TILVAB1 Vertical Connector Kit
K (8)
1/4-20 x 1/2"
[Vertical connector]
[Sold separately]
TIL1XXIFJ Series Hardware Kit
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
6
PRE-INSTALLATION
IMPORTANT ! : Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED screens.
CAUTION: Handle the LED screens with care, being
careful to not impact or drop the LED screen.
CAUTION: There is a magnetic surface on the front of the
LED screen. To prevent damage ensure that no metallic
object is pulled onto the LED screen.
NOTE: When planning the installation, remember the
requirement to run power and signal to the video wall.
Ensure there is also adequate clearance for the plug
head. Recessed outlets or angled plugs may be
required.
Site Assessment
Before beginning any installation the site should be assessed in
several areas to help avoid any issues during the actual
installation.
•Wall Structure - It is recommended that a 3/4"
furniture-grade plywood-backed wall be used in most
LED video walls. The use of a wood stud wall is not
appropriate since the studs won’t be in the proper
location for an LED video wall.
•Wall High/Low Points - Locate any high or low points
on the wall that may cause problems, and try to set up
install so that these points can be avoided, if possible.
•Flatness/Plumb of Wall - Learn how much depth
adjustment will be needed across the LED video wall
mounting area.
•Power/Cable - Locate all power outlets and cable
access holes that need to be cleared by the installation.
Plan appropriately for those holes.
•Installing in a Recess - Verify the level and
squareness of the recessed area. Since these areas
are rarely perfect you may need to decide what to use
as a reference point.
•The recess top or bottom may not be level so the
video wall may need to be installed to align with
the recess, rather than being level with the wall.
• If the recess is not square the sides may make the
recess look crooked. If possible, the recess
should be fixed. If repairing the recess isn’t an
option it may be best to "split the difference"
between the recess sides to make the video wall
appear level.
•Where to Begin the Video Wall - The installer should
make the decision whether the video wall will be started
at the top, bottom, left, right or center.
• If a lower bottom reference is given in the
specifications, it may make sense to start at the
bottom of the video wall to ensure that this
specification is met from the start of installation.
• If building inside of a recess, it may be easier to
start in the center of the space since the video
wall will most likely need to be centered within the
recess.
• Vertical Connector Brackets - If creating a video wall
with more than a single row you will be using the
TILVAB1 vertical connectors which are sold
separately.
•
Vertical Connector Brackets [sold separately]
If the video wall requires multiple rows, decide on
whether the installation will start with the top or
bottom row. This determines to which end (top or
bottom) the vertical connector brackets are
attached.
Figure 1
Just a tip - For larger LED walls it is helpful to
check placement and alignment of the mounts by
putting a few cabinets without the LED’s in place in
the bottom row of the installed mounts (referencing
the LED screen installation manual for specific
instructions) during the mount installation, verifying
that everything is staying aligned and level, and
then continuing the mount installation.
Just a tip - The horizontal slots located along
the vertical mount pieces (and vertical slots
located along the horizontal mount pieces) are the
center-of-screen indicators to illustrate where the
center of each LED screen will be located, and can
be used to hold a tape measure tab while
measuring. (See Figure 1)
= Center-of-screen indicators
Tape
Measure
[TIL1X3IFJ shown as example]
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
7
INSTALLATION
Adding Vertical Connector Kit
NOTE: If more LED screens will need to be added to the top or
bottom of the screen configuration, add TILVAB1
vertical connector kit to top or bottom of wall mount
using the following instructions. If you are NOT adding
the TILVAB1 connector kit, proceed to Installing First
Mount section.
IMPORTANT ! : Install the vertical connector kit
BEFORE the mounts are attached to the wall.
If Starting LED Wall Installation With the Top Row
NOTE: If you’re starting the installation at the top of the LED
video wall, the vertical connector brackets should be
attached to the BOTTOM of the mounts to create the
top row and each successive lower row.
1. Slide the vertical connector (L) up from the bottom of the
mount, and attach with two 1/4-20 x 1/2" Phillips pan head
screws (K) per vertical connector. (See Figure 2)
2. Partially install one 1/4-20 x 1/2" Phillips pan head screw (K)
in the upper screw hole at the bottom of each vertical
connector (L). (See Figure 2)
Figure 2
If Starting LED Wall Installation With the Bottom Row
NOTE: If you’re starting the installation at the bottom of the
LED video wall, the vertical connector brackets should
be attached to the TOP of the mounts to create the
bottom row and each successive upper row.
1. Slide the vertical connector (L) down from the top of the
mount, and attach with two 1/4-20 x 1/2" Phillips pan head
screws (K) per vertical connector. (See Figure 3)
2. Partially install one 1/4-20 x 1/2" Phillips pan head screw (K)
in the lower screw hole at the top of each vertical connector
(L). (See Figure 3)
Figure 3
(L)
(K) x 2
1
2
(K)
1
(L)
Mount
(K) x 2
1
1
2
(K)
(L)
Mount
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
8
Preparing LED Cabinet
NOTE: If mounting buttons are already installed to your LED
cabinet, proceed to Assessing the Installation Site
section.
1. Attach four mounting buttons (supplied by Samsung) using
the hardware and following the instructions included with
the LED cabinets.
Assessing the Installation Site
IMPORTANT ! :
The top of the LED panel is 5.5" above
the top of the
UPPER
mounting slots, and the bottom of
the LED panel is 6.25" below the top of the
LOWER
mounting slots. (See Figure 4)
NOTE: If desired, the mount installation may be started in the
middle of the video wall, attaching mounts out from the
center to the left and right ends. (Review Site
Assessment section for further information.)
Installation on smaller walls may be easier if started at
the left or right side of the video wall using the following
instructions.
1. Determine top or bottom panel height location and
horizontal placement of mounts. (See Figure 4)
2. Make a mark 5.5"
below
the planned top edge (or 6.25"
above
the planned lower edge of the LED wall. (See Figure 4)
3. Using a level, mark a horizontal line across width of LED
wall from the mark made in Step 2.
NOTE:
This line will be located at the top of the mounting slots
across the width of the LED video wall. The oversize
mounting slots will allow some upward adjustment as
needed. (See Figure 4)
Figure 4
Installing First Mount
The TIL1X2IFJ / TIL1X3IFJ /TIL1X4IFJ LED wall mounts are
designed to be mounted to:
• a bare 8" concrete wall or 8"x8"x16" concrete block
wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
• a 3/4" thickness plywood-backed, steel stud wall
covered with drywall having a maximum
thickness of 5/8".
Just a tip - It is often a good idea to review
installation instructions and dimensional drawings
(at end of instructions), and then utilize masking
tape to lay out the entire LED video wall to lessen
the chance of any surprises later in the installation.
5.5”
6.25”
5.5”
6.25”
Top of LED cabinet
[TIL1X3IFJ mount shown - Wall side - Rear View]
2
2
3
Horizontal
mark through
top of mount
slots
Bottom of LED cabinet
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
9
Table 1: Fastener Information
1. Make final decision on where to begin the LED video wall
installation (left, right or center; and top or bottom).
2. Make sure the vertical connectors are attached to top or
bottom depending on installation decision.
3. Place mount against wall matching the top of the mounting
slots with the horizontal line previously drawn.
4. Mark mounting holes in two top mounting slots along the
horizontal line marked in Step 3 of Assessing the
Installation Site section. (See Figure 5)
NOTE: The mounting holes are 25.0" apart on-center. (See
Figure 5)
Figure 5
5. Drill two pilot holes (see Table 1 for size) at each location
marked in Step 4 (See Figure 5) and follow fastener
information (appropriate for wall type) located in Table 1.
IMPORTANT ! : Refer to Fastener Installation Methods
(located in Appendix at end of Installation Instructions)
for details on installing product into various wall types.
6. Partially install two lag screws into wall, but do NOT
completely tighten to wall. (See Figure 6)
NOTE: Utilizing the two adjustment washers (A, B) allows the
installer to pre-install the top mounting fasteners and
hang the mount from them utilizing the mounting slots.
This allows the weight of the mount to be held by the
mounting bolts during installation, and not the installer.
Figure 6
7. Hang wall mount, aligning upper mounting slots over
fasteners, and adjust side-to-side for proper location. (See
Figure 6)
8. Place a level across front of the mount at bottom of teardrop
slots. (See Figure 7)
9. Check the level of the mount at the teardrop slots. (See
Figure 7)
Figure 7
WALL
TYPE PILOT
HOLE FASTENERS (see PARTS
drawing)
Drywall
attached to
plywood-
backed walls
/Steel studs
Drywall
attached to
plywood-
backed walls
/Wood studs
1/2"
7/32" x 3"
- 1/4-20 x 2-1/2" hex head lag (not
included)
- 1/4" washer (not included)
- 1/4-20 Toggler Snaptoggle BB
(not included)
- 5/16 x 2-1/2" flanged hex head
lag (D)
- 5/16" washer (E)
- Adjustment washers (A, B)
Concrete or
concrete
block
3/8" x 3" - 5/16 x 2-1/2" flanged hex head
lag (D)
- 5/16" washer (E)
- Adjustment washers (A, B)
- Fischer Anchor UX10x60R (C)
4
25.0 inches
5
Line showing top
of mounting slots
7
x 2
[TIL1X2IFJ shown as example]
6
8
Mount
teardrop
Level
slots
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
10
10. Slide the left (B) and right adjustment washers (A) into place
behind the partially installed lag screws. (See Figure 8)
Figure 8
11. Check the level of the mount at the bottom of the teardrop
slots. (See Figure 9)
12. If the mount is not level, slide or use a dead blow hammer
to lightly tap the spacer into place. This will lift the mount up
as the lag screw rides in the washer’s angled slot. (See
Figure 9)
13. When the mount is leveled, tighten the lag screws (D). (See
Figure 9)
Figure 9
14. Drill pilot holes in centerline of lower slots (see Table 1 for
size) and follow fastener information (appropriate for wall
type) located in Table 1. (See Figure 10)
15. Double check the level of the mount at the bottom of the
teardrop slots. (See Figure 10)
16. Fully tighten the 5/16 x 2-1/2" lag screws (D) through the 5/16"
fender washers (E). (See Figure 10)
Figure 10
(B)
(A)
10
Just a tip - Tighten down the lag screw on the
side that does NOT need to be raised. This
creates a pivot point for when the opposite
adjustment washer is tapped into place, and
allows that correct side of the mount to move up.
Level
Dead blow
hammer
(B) (A)
13
(D) x 2
16
(E) x 2
15
(D) x 2
4
x 2
Teardrop slots
Just a tip - After the first mount is installed, it
may be easier to adjust the plumb at this time. If a
lot of adjustment is going to be necessary it’s best
to adjust it right away to avoid any twist or tension
on the mount.
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
11
17. Using a level on the front of the mount in various places, use
a 3/4" or 19mm deep-well socket and square drive
ratcheting wrench to adjust the leveling feet on the mount
until the mount is plumb or even with something that is being
used as a reference point. (See Figure 11)
CAUTION: Over-torquing may cause damage. Do NOT
use a drill to make the depth adjustment.
Figure 11
Adding Additional Mounts
1. Partially install two 1/4-20 x 1/2" Phillips head screws (H)
into the fastener holes (next to the teardrop holes) at the top
and bottom of the mount, and on the side of the mount you
want to attach another mount. (See Figure 12)
Figure 12
2. Hang the second mount (using teardrop slots at top and
bottom on the left side) onto the fasteners installed in Step 1.
(See Figure 13)
3.
Fully tighten fasteners installed in Step 1.
(See Figure 13)
Figure 13
Leveling feet
locations
17
1
(H) x 2
[TIL1X3IFJ shown as example]
Teardrop
hole
2
3
(H) x 2
Second
wall mount
2
1
Installed
mount
2
1
wall
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
12
4.
Drill pilot hole towards top and in centerline of upper
mounting slot of second mount closest to installed mount
(see Table 1 for size) and follow fastener information
(appropriate for wall type) located in Table 1. (See Figure 14)
Figure 14
5. Loosen the side connector screws (installed in Step 1)
about 1/4 turn.
6.
Slide the adjustment washer into place behind the partially
installed lag screw until the bottom of the teardrop slots are
aligned.
(See Figure 15)
7. Tighten first lag screw.
Figure 15
NOTE: The second mount will most likely need to be raised
slightly to align with installed mount.
8. After the first lag screw is installed, hold the second mount
at approximately parallel with the installed mount, and drill a
pilot hole in the center of the remaining upper mounting slot.
9. Install adjustment washer and push in until the mounting
slots are level and aligned.
10. Tighten second lag screw.
11. Re-tighten connector screws, upper and lower. (See
Figure 13)
12. Drill lower pilot holes on second mount at the center both
vertically and horizontally within lower mounting slots and
use same fasteners used at top of mount.
13. Continue installation of mounts in this manner until the row
is complete.
Just a tip - The plumb on these mounts at this
point doesn’t have to be perfect. Final adjustments
can be done once all the mounts are installed.
Checking and adjusting plumb at this point
ensures the mounts are closely aligned on the
same plane to prevent the mount from twisting or
bending when the lag screws are installed.
4
x 2
Second mount
Just a tip - The lag screws need to be at the
top of the mounting slot to allow the mount to be
raised slightly, if needed, to align it with the
previously installed mount.
Slide adjustment
washer into place
6
Installed wall mount
Second wall mount
Align bottom of
6
teardrop slots
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
13
Checking Placement and Alignment
1. The holes around slots on the mounts can be used for the
included #10 x 1/2" self-tapping screws (F) to help attach a
string to help in aligning and plumbing the mounts.
NOTE: There are multiple points on each mount where the
screws can be installed for the plumb line. At a
minimum, the plumb strings should be strung next to
each adjustment point (at every leveling foot). (See
Figure 16)
2. Loosely install the self-tapping screws then wrap the string
around the screw and tighten. (See Figure 16)
3. Run the string tightly between the same hole at each end of
the row of mounts. (See Figure 16)
Figure 16
1
Arrows indicate tapping
screw hole locations for
attaching string to assist
with alignment of mounts
String to
assist with
alignment
2
3
Leveling feet
(top and bottom,
of each mount)
left and right
2
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
14
4. If the cabinets need to be moved slightly to either the left or
right, insert two 10-24 x 1" self-tapping screws (G) per
cabinet into the left or right side of the mount. (See
Figure 17)
NOTE: There are two places on each cabinet for the side stop
screws to be installed. These screws will act as an
adjustable left or right stop. Turn the screw IN to adjust
the stop to the right, and back the screw OUT to move
the stop to the left.
Figure 17
5. When installing a cabinet to the mounting system, line up
mounting buttons with mounting holes at each corner.
6. Guide cabinet mounting buttons into mounting holes.
7. Lower cabinet ensuring that mounting buttons are securely
seated in the four mounting holes. (See Figure 18)
Figure 18
8. After the bottom row of cabinets are installed, it is a good
idea to install the far left or right column of cabinets to check
that everything is square and straight.
NOTE: There
are 2 places on
each cabinet for
left or right side
4
4
to be installed
stop screws
(G)
[TIL1X3IFJ shown as example]
Mounting
button
6
Mounting hole
7
Cabinet
Just a tip - When installing in a recess it may
also be helpful to install the far right column. This
allows you to check for squareness and level
inside of the recess.
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
15
Connecting Mounts Above or Below First Row
• Hanging Mounts from an Upper Row
1.
Hang the lower mount on the partially installed
Phillips head screws (K) in the vertical connectors
(L). (See Figure 19)
2. Tighten both lower screws (K) on both vertical
connectors (L). (See Figure 19)
Figure 19
• Installing Mounts onto a Lower Row
3. Make sure the 1/4-20 x 1/2" Phillips head screw
(K) is already loosely installed in the vertical
connector (L) on both sides of the mount. (See
Figure 20)
4. Slide mount down onto the screws so that upper
mount sets on lower mount.
5. Install two 1/4-20 x 1/2" Phillips head screws (K)
into upper hole on both vertical connectors, and
tighten all screws. (See Figure 20)
6. Place a long level against front of the mounts and
adjust the depth of the newly attached mount to
align it with the first, installed mount.
7. Adjust the leveling feet on the newly installed
mount so that they are touching the wall.
8. Drill pilot holes in centerline of each mounting slot
on each leveling foot of the added mount (see
Table 1 for size) and follow fastener information
(appropriate for wall type) located in Table 1. (See
Figure 20)
Figure 20
9. Double check the level of the mount at the bottom of the
teardrop slots, and make sure the new mount stays
perfectly aligned with the upper or lower mount to which it
was attached. (See Figure 21)
10. Fully tighten the fasteners. (See Figure 21)
Figure 21
11. Continue on until the entire LED wall is assembled.
Installed
mount
1
(L)
Lower
mount
(K) x 2
2
(K) x 2
5
Set mount
3
4
Installed
mount
4
on loosely
installed screw
(E) x 4
8
x 4
9
10
(D) x 4
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
16
APPENDIX
Fastener Installation Methods
IMPORTANT ! : See Table 1 for appropriate hardware
and pilot hole sizes for various wall types.
IMPORTANT ! : The expanse of the LED wall will most
likely mean that attachment of the wall mounts will not all
be in studs. The attachment method will most likely vary
throughout the installation, and more than one of the
various methods outlined here will most likely be used.
Wood Stud
1. Use one 5/16" x 2-1/2" hex flange head lag bolt (D) and one
5/16" washer (E) through product and into pilot hole. (See
Figure 22)
2. Repeat for remaining pilot holes.
Figure 22
Concrete or Concrete Block
1. Install one UX10X60R anchor (C) into each pilot hole using
a hammer, making sure that the anchor is flush with the wall.
(See Figure 23)
2. Use one 5/16" x 2-1/2" hex flange head lag bolt (D) and one
5/16" washer (E) through product into each anchor in wall.
(See Figure 23)
3. Repeat for remaining pilot holes.
Figure 23
Steel Stud
IMPORTANT ! : See Site Requirements for Steel Stud
Installation section before proceeding with Steel Studs
installation to ensure installation site meets requirements!
The drywall must have a minimum thickness of 1/2"!
1. Hold metal channel on anchor flat alongside plastic straps
and slide channel through hole. (See Figure 24)
Figure 24
2. Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 25)
3. Slide plastic cap on anchor towards wall until flange of cap
is flush with wall. (See Figure 25)
Figure 25
4. Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 26)
Figure 26
1
2
(D)
(E)
1
2
(D)
(C)
(E)
Drywall
Plastic straps
1
Plastic cap
Drywall
Anchor metal channel
3
Steel stud
(side view)
2
(if present)
Plastic straps
Drywall
Anchor metal channel
Plastic cap
4
Steel stud
(side view)
(if present)
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
17
5. Line up anchor with attachment point.
6. Insert 1/4-20 x 2-1/2" hex head screw through 1/4" washer,
corresponding mounting hole in wall bracket and into
anchor, and tighten until flush against wall bracket. DO NOT
over tighten! (See Figure 27)
Figure 27
Drywall
Anchor metal channel
Hex Head
6
Steel stud
Washer
(side view)
Wall bracket
(if present)
screw
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
18
Site Requirements for Wood or Steel Stud Installation
Figure 28
FRONT
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" or 24" (on center) Studs
If back side of wall is unfinished,
to a minimum of one stud left
drywall must be installed
and right of the stud(s) being used
to install the mount. Drywall must be
secured to studs with screws a
maximum of 12" (305mm) apart
down center of stud.
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
(Both Sides of Stud)
[362 S 125 18, C-Shaped, S-Stud Section]
Plywood
3/4" minimum thickness
plywood covered
with drywall having
maximum thickness of 5/8"
5/8" maximum
drywall thickness
Stud
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
19
DIMENSIONS
TIL1X2IFJ
PLUMB
ADJUSTMENT
2.22
56.4
MINIMUM
DEPTH
2.97
75.4
MAXIMUM
DEPTH
.50
12.7
SHOWN WITH SAMSUNG IFJ SERIES LED PANELS
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
20
DIMENSIONS -- cont’d
PLUMB
ADJUSTMENT
TIL1X3IFJ
SHOWN WITH SAMSUNG IFJ SERIES LED PANELS
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
21
DIMENSIONS -- cont’d
HORIZONTAL SLOTS CORRESPOND
TO APPROXIMATE C/L OF LED PANELS
SHOWN WITH SAMSUNG IFJ SERIES LED PANELS
TIL1X4IFJ
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
22
DIMENSIONS -- cont’d
CREATED USING 4 TIL1X4IFJ MOUNTS
4X4 WALL
SHOWN WITH SAMSUNG IFJ PANELS
3.85
97.8
MINIMUM
DEPTH
17.86
453.6
CREATED USING 4 TIL1X4IFJ MOUNTS
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1
23
DIMENSIONS -- cont’d
5 X 5 CONFIGURATION CREATED UTILIZING
5-TIL1X3IFJ
5-TIL1X2IFJ
5X5 WALL
SHOWN WITH SAMSUNG IFJ PANELS
5 X 5 CONFIGURATION CREATED UTILIZING
5-TIL1X3IFJ
5-TIL1X2IFJ
5-TILVAB1
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X2IFJ / TIL1X3IFJ / TIL1X4IFJ/ TILVAB1 Installation Instructions
USA/International A 6436 City West Parkway, Eden Prairie, MN 55344
P800.582.6480 / 952.225.6000
F877.894.6918 / 952.894.6918
Europe A Franklinstraat 14, 6003 DK Weert, Netherlands
P+31 (0) 495 580 852
F+31 (0) 495 580 845
Asia Pacific A Office No. 918 on 9/F, Shatin Galleria
18-24 Shan Mei Street
Fotan, Shatin, Hong Kong
P852 2145 4099
F852 2145 4477
8800-00003231 Rev00
2020 Legrand | AV
www.legrandav.com
12/2020