Chief TILVABPT User Manual
Displayed below is the user manual for TILVABPT by Chief which is a product in the Monitor Mount Accessories category. This manual has pages.
Related Manuals
INSTALLATION INSTRUCTIONS
TIL1X2PT
TIL1X3PT
TIL1X4PT
TILVABPT
Accessory
PT Series LED Wall Mounts / Accessory
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
TIL1X2PT / TIL1X3PT / TIL1X4PT /
TILVABPT
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
2
DISCLAIMER
Legrand | AV and its affiliated corporations and subsidiaries
(collectively “Legrand | AV”), intend to make this manual
accurate and complete. However, Legrand | AV makes no claim
that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Legrand | AV
makes no representation of warranty, expressed or implied,
regarding the information contained herein. Legrand | AV
assumes no responsibility for accuracy, completeness or
sufficiency of the information contained in this document.
Chief® is a registered trademark of Legrand AV Inc.
DEFINITIONS
MOUNTING SYSTEM: A MOUNTING SYSTEM is the
primary Chief product to which an accessory and/or component
is attached.
ACCESSORY: AN ACCESSORY is the secondary Chief
product which is attached to a primary Chief product, and may
have a component attached or setting on it.
COMPONENT: A COMPONENT is an audiovisual item
designed to be attached or resting on an accessory or mounting
system such as a video camera, CPU, screen, display,
projector, etc.
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voiding of factory warranty! It is the
installer’s responsibility to make sure all mounting systems
are properly assembled and installed using the instructions
provided.
WARNING: Failure to provide adequate structural strength
for this mounting system can result in serious personal injury
or damage to equipment! It is the installer’s responsibility to
make sure the structure to which this mounting system is
attached can support five times the combined weight of all
equipment. Reinforce the structure as required before
installing the mounting system. The wall to which the
mounting system / accessory is being attached may have a
maximum drywall thickness of 5/8” (1.6cm). Do not install
drywall anchors into the seam between drywall pieces.
WARNING: The TIL1X2PT / TIL1X3PT / TIL1X4PT LED
wall mounts are designed for use with LED panels only.
Exceeding the weight capacity (listed) can result in serious
personal injury or damage to equipment!
• TIL1X2PT: 40 lbs (18.1 kg) - 20 lbs (9.1 kg) per
screen;
• TIL1X3PT: 60 lbs (27.2 kg) - 20 lbs (9.1 kg) per
screen;
• TIL1X4PT: 80 lbs (36.3 kg) - 20 lbs (9.1 kg) per
screen.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a service center for
examination and repair.
WARNING: Do not use this mounting system outdoors.
IMPORTANT ! : The TIL1X2PT / TIL1X3PT / TIL1X4PT LED
wall mounts are designed to be mounted to:
• a bare 8" concrete or 8"x8"x16" concrete block wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
• a 3/4" thickness plywood-backed, steel stud wall
covered with drywall having a maximum thickness of
5/8".
--SAVE THESE INSTRUCTIONS--
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
3
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips Screwdriver
Destornillador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Clé à fourche
By Hand
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
Hex-Head Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Zeskantsleutel
Clé à tête hexagonale
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Adjust
Ajustar
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Remove
Quitar
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Optional
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
4
TOOLS REQUIRED FOR INSTALLATION
PARTS
Hardware Required - not included
(for installation into steel stud walls)
1. Chief brand FCAT1 Toggler Kit; OR
2. Hardware for installation to steel stud wall:
• 1/4-20 Toggler Snaptoggle BB (Qty 4)
•1/4-20 x 2-1/2" hex head bolt (Qty 4)
• 1/4" washer (Qty 4)
7/32"
#2
Level
[4+ ft. long]
[Small level] 3/8"
1/2"
Ratchet with
1/2" drive
String
1" deep
well socket
Mounting Hardware Kit (Qty per bag)
N (2)
[Vertical connector]
P (1)
[TIL1X2PT]
Q (1)
[TIL1X3PT]
R (1)
[TIL1X4PT]
OR OR
TiLEDPT Hardware Kit (Qty per bag)
[Adjustment
washers]
B (4)
[UX10x60R anchor]
C (4)
5/16 x 2-1/2"
D (4)
5/16"
E (2)
1/4-20 F (4)
1/4"
G (6)
#10 x 1/2" H (2)
1/4-20 x 4-1/2" J (8)
10-24 x 1"
Mounting Button Kit (Qty per bag)
K (4)
M5x20mm L (4)
[Mounting button]
TILVABPT Vertical Connector Kit [Sold separately]
M (8)
1/4-20 x 1/2"
TIL1X2PT: 2 bags
TIL1X3PT: 3 bags
TIL1X4PT: 4 bags
A - Left (1)
A - Right (1)
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
5
INSTALLATION
Preinstallation
IMPORTANT ! : Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED screens.
CAUTION: Handle the LED screens with care, being
careful to not impact or drop the LED screen.
CAUTION: There is a magnetic surface on the front of the
LED screen. To prevent damage ensure that no metallic
object is pulled onto the LED screen.
NOTE: When planning the installation, remember the
requirement to run power and signal to the video wall.
Preparing LED Screens
1. Attach four mounting buttons (L) per LED screen, one to
each corner of LED screen, with four M5 x 20mm Phillips flat
head screws (K). (See Figure 1)
Figure 1
Determining Installation Site
IMPORTANT ! :
The top of the LED screen is 7" above
the center line of the mounting lags in the mounting slots.
(See Figure 2)
NOTE: If desired, the mount installation may be started in the
middle of the video wall, attaching mounts out from the
center to the left and right ends. Installation on smaller
walls may be easier if started at the left side of the video
wall using the following instructions.
1. Determine location for the top left corner of the LED wall.
(See Figure 2)
2. Make a mark 7" below the planned top left corner of the LED
wall. (See Figure 2)
3. Using a level, mark a horizontal line across width of LED
wall from the mark made in Step 2.
NOTE:
This line will indicate the center line for the location of the
mounting lags in the mounting slots for the top mount(s)
in the video wall. The oversize mounting slots will allow
some upward adjustment as needed. (See Figure 2) and
(See Figure 3)
Figure 2
Figure 3
(OPTIONAL) Adding Vertical Connector Kit (Sold
Separately)
NOTE: If more LED screens will need to be added to the top or
bottom of the screen configuration, add TILVABPT
vertical connector kit to top or bottom of wall mount
using the following instructions. If you are NOT adding
the TILVABPT connector kit, proceed to Installing
First Mount section.
(L)
LED screen
1
(K)
[TIL1X2 shown as example -
2 screens shown]
Location for top left corner of LED wall
1
2
7"
3
7”
7”
[TIL1X2PT shown as example]
3
Mounting slot
center line
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
6
IMPORTANT ! : It is easier to install the vertical
connector kit BEFORE the mounts are attached to the
wall. However, it can also be installed after the mounts
are attached to the wall.
1. Add the vertical connector (N) to the top or bottom of the
mount, and fasten with two 1/4-20 x 1/2" Phillips pan head
screws (M) per vertical connector. (See Figure 4)
2. Connect another wall mount to the other end of the vertical
connector to lengthen the video wall.
Figure 4
NOTE: When connecting a mount to the bottom of an installed
mount, the lower mount may be hung by its open slot
on the partially installed Phillips head screw (M) before
tightening the connection. (See Figure 5)
NOTE: When connecting a mount above an already installed
mount, the upper mount may be slid down and
attached to the connector in the top of the already
installed mount.
Figure 5
Installing First Mount
The TIL1X2PT / TIL1X3PT /TIL1X4PT (TVF Series) LED wall
mounts are designed to be mounted to:
• a bare 8" concrete wall or 8"x 8"x 16" concrete block
wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
•
a 3/4" thickness plywood-backed, steel stud wall
covered with drywall having a maximum thickness of
5/8".
Table 1: Fastener Information
1. Hold furthest left, top wall mount against wall ensuring that
mounting slot is lined up with center line marked on the wall
in Determining Installation Site section. Double-check
with a level. (See Figure 6)
2. Mark mounting holes in two top mounting slots along the
horizontal line marked in Step 3. (See Figure 6)
NOTE: The mounting holes are 17.22" apart on-center. (See
Figure 6)
Figure 6
3. Drill two pilot holes (see Table 1 for size) at each location
marked in Step 2 (See Figure 6) and follow fastener
information (appropriate for wall type) located in Table 1.
1
(M) x 4
(N)
(M) x 2
Top
mount
Lower
mount
Hang open slot
both screws (M).
screw (M) and tighten
installed Phillips head
onto partially
(N)
WALL
TYPE PILOT
HOLE FASTENERS (see PARTS
drawing)
Drywall
attached to
plywood-
backed walls
/Steel studs
Drywall
attached to
plywood-
backed walls
/Wood studs
1/2"
7/32" x 3"
- 1/4-20 x 2-1/2" hex head lag (not
included)
- 1/4" washer (not included)
- 1/4-20 Toggler Snaptoggle BB
(not included)
- 5/16 x 2-1/2" flanged hex head
lag (C)
- 5/16" washer (D)
- Adjustment washer (A)
Concrete or
concrete
block
3/8" x 3" - 5/16 x 2-1/2" flanged hex head
lag (C)
- 5/16" washer (D)
- Adjustment washer (A)
- Fischer Anchor UX10x60R (B)
2
17.22 inches
3
Line showing
slots for top
mounts in LED
center of mounting
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
7
IMPORTANT ! : Refer to Fastener Installation Methods
(located in Appendix at end of Installation Instructions)
for details on installing product into various wall types.
4. Partially install two lag screws into wall, but do NOT
completely tighten to wall. (See Figure 7)
NOTE: (OPTIONAL) If more LED screens need to be added to
the top or bottom of the screen configuration, add
TILVABPT vertical connector kit (not included) to top or
bottom of wall mount following instructions in the
(OPTIONAL) Adding Vertical Connector Kit. If you
are NOT adding the TILVABPT connector kit, proceed
to Step 5.
Figure 7
5. Hang wall mount, aligning upper mounting slots over
fasteners, and adjust side-to-side for proper location, but do
NOT completely tighten to wall. (See Figure 7)
6. Place a level across front of the mount at bottom of teardrop
slots. (See Figure 8)
7. Check the level of the mount at the teardrop slots. (See
Figure 8)
Figure 8
8. Slide the left (A-Left) and right (A-Right) adjustment washers
into place behind the partially installed lag screws. (See
Figure 9)
Figure 9
9. Check the level of the mount at the bottom of the teardrop
slots. (See Figure 10)
10. If the mount is not level, slide or use a dead blow hammer
to lightly tap the spacer into place. This will lift the mount up
as the lag screw rides in the washer’s angled slot. (See
Figure 10)
11. When the mount is leveled, tighten the lag screws (C). (See
Figure 10)
Figure 10
5
x 2
4
7
Mount
teardrop
Levels
slots
6
8
A (right)
A (left)
Just a tip - Tighten down the lag screw on the
side that does NOT need to be raised. This
creates a pivot point for when the opposite
adjustment washer is tapped into place, and
allows that correct side of the mount to move up.
Level
Dead blow
hammer
11
(C) x 2
9
10
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
8
12. Drill pilot holes in centerline of lower slots (see Table 1 for
size) and follow fastener information (appropriate for wall
type) located in Table 1. (See Figure 11)
13. Double check the level of the mount along the side of the
mount. (See Figure 11)
14. Fully tighten the 5/16 x 2-1/2" lag screws (C) through the 5/16"
fender washers (D). (See Figure 11)
Figure 11
15. Using a level on the front of the mount in various places, use
a 1" socket and T-handle driver to adjust the leveling feet on
the mount until the mount is plumb. (See Figure 12)
CAUTION: Over-torquing may cause damage. Do NOT
use a drill to make the depth adjustment.
Figure 12
Adding Additional Mounts
1. Hold additional wall mount against wall ensuring that
mounting slot is lined up with center line marked on the wall
in Determining Installation Site section. Double-check
with a level. (See Figure 6)
2. Mark mounting holes in two top mounting slots along the
horizontal line. (See Figure 6)
3. The mounting holes are 17.22" apart on-center. (See
Figure 6)
4. Drill two pilot holes (same size as those drilled for first
mount) at each marked location and use same fasteners
used on the first mount.
5. Partially install two fasteners into wall, but do NOT
completely tighten to wall.
6. Hang wall mount, aligning upper mounting slots over
fasteners, and adjust side-to-side for proper location.
7. Install two 1/4-20 x 4-1/2" hex head bolts (H) and two 1/4"
steel washers (F) into the right or left side of the second
mount at
both top and bottom
, and through into the left or
right side of the first mount. (See Figure 13)
NOTE:
The second mount may be attached to either the left or
right side of the first already installed mount.
8. Loosely fasten second mount to first mount using two 1/4"
steel washers (F) and two 1/4-20" flanged hex nuts (E). (See
Figure 13)
9. Slide adjustment washers (A) behind head of upper fasteners
in mount. (See Figure 13)
10. Tighten both fasteners between mounts (at top and bottom
where the second mount is connected to the first mount).
(See Figure 13)
Figure 13
14
x 2
12
x 2
13
Level
Leveling feet
locations
15
7
Mount already
attached to wall
Additional mount
being added to
first mount
(H) x 2
(F) x 4
(E) x 2
FIRST MOUNT
SECOND MOUNT
8
[TIL1X3PT shown
10
as example]
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
9
11. Lay levels across flat of the mounting holes and center-of-
screen indicators, and vertically along side of mount to
ensure wall mount is square and level.
NOTE:
Lift up slightly on the far side of the second mount to help
level the mount.
12. Hold the adjustment washers in place by hand and tighten
the fasteners at the top of the mount.
13. Drill lower pilot holes at attachment locations and use same
fasteners used at top of mount.
14.
Install two fasteners through lower part of mount and tighten.
IMPORTANT ! : For larger LED walls it is helpful to check
placement and alignment of the mounts by putting a few
LED housings in place in the bottom row of the installed
mounts (referencing the LED screen installation manual
for specific instructions) during the mount installation,
checking alignment before removing the housings, and
then continuing the installation.
IMPORTANT ! : Continually recheck the alignment and
overall flatness of the wall mounts during the installation
process.
15. Continue the installation process until all wall mounts are
attached.
16. Install one #10 x 1/2" Phillips tapping screw (G) into left
upper LED mounting button hole for each LED screen
space. Install the tapping screws ONLY on the furthest left
column of mounts. (See Figure 14)
Figure 14
IMPORTANT ! : The tapping screws keep the LED
screens centered on the mount, and are ONLY installed
on the furthest left column of mounts.
17. Using a drill driver makes installation of the tapping screws
(C) easier.
Model Fastener
Qty
TIL1X4PT 4
TIL1X3PT 3
TIL1X2PT 2
[TIL1X2PT shown as example]
16
(G)
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
10
18. Install the remaining #10 x 1/2" self-tapping screws (G) on
the mount, as necessary, to assist in centering the LED
housings. (See Figure 15)
19. Run a string between the self-tapping screws installed in
Step 18 to assist with alignment across long sections of
mounts. (See Figure 15)
Figure 15
String to assist
19
[Multiple TIL1X3PT shown as example
(G)
18
for using string to assist
with alignment.]
[TIL1X4PT shown as example]
Circles indicate tapping
screw hole locations for
attaching string to assist
with alignment of mounts
18
with alignment
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
11
Installing Housings and LED Screens
IMPORTANT ! : Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED housings and screens.
NOTE: Begin the installation of the housings in the lower left
corner of the video wall.
NOTE: One complete column of housings should be installed
before proceeding to the next column.
Figure 16
1. Install the first LED housing in the lowest left-hand corner of
the video wall by aligning mounting buttons on the housing
with the mounting holes on the wall mount.
2. Move LED housing forward until all four mounting buttons are
through mounting holes in wall mount.
3. Continue with the next housing (directly above installed
housing).
NOTE:
Be sure to check the level and plumb of the housings
often during the housing installation.
4.
AFTER
the
entire
first column of housings are installed, slide
the column to the left side so that the mounting buttons are
against the tapping screws, and to allow clearance for
installation of the second column.
5. After the second column of housings is installed, push to the
left until the first and second columns of housings are
touching.
6. Repeat until all housings are installed.
NOTE:
The tapping screws assist in centering the housings on
the mounts.
7.
OPTIONAL:
Remove tapping screws if housings need to be
moved further left or right of center.
8.
OPTIONAL:
Install two 10-24 x 1" Phillips head cap screws
(J)
per housing
on far right and far left column of mounts if
housings need to be moved further left or right of center. (See
Figure 17)
NOTE:
The screws (J) are installed from the right side of the
furthest right wall mount and the left side of the furthest
left wall mount and can be used to push the housings to
the left or right to slightly level or align the housings by
adjusting the amount of push at the bottom or top of the
housing. The screws (J) can also be used to prevent
removal of the LED screens.
2
LED Housing
[TIL3X3PT wall shown as example]
Begin LED housing install
in the lowest left corner of
the video wall
1
Figure 17
[TIL3X3PT wall shown as example]
[Back view]
8
(J)
8
(J)
Mounting
button
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
12
9. Using levels, check the level and plumb of the housings
installed on the mounts and adjust as necessary following
information in the Adjustments section.
10. Connect housings following instructions included with LED
screens.
11. Install LED screens following instructions included with
screens.
Adjustments
Depth Adjust
The depth of each wall mount section is controlled by the
leveling feet.
1. Using a level on the front of the housings in various places,
loosen or tighten the leveling feet adjust bolt (using a 1"
socket and T-handle driver) to assist in leveling the LED
housings across the various wall mounts until plumb. (See
Figure 18)
IMPORTANT ! : It is best to make adjustments in small
increments to prevent any binding or torquing of the
mounts. Be sure to adjust the depth evenly for both sides
of the mounts.
CAUTION: Over-torquing may cause damage. Do NOT
use a drill to make the depth adjustment.
Figure 18
2. If a significant adjustment is required in order to level the
mounts, the fasteners installed in the Adding Additional
Mounts section may be removed to allow adjustment to one
mount without affecting the other mounts.
Leveling feet
locations
1
[LED housings not shown]
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
13
Fastener Installation Methods
IMPORTANT ! : See Table 1 for appropriate hardware
and pilot hole sizes for various wall types.
IMPORTANT ! : The expanse of the LED wall will most
likely mean that attachment of the wall mounts will not all
be in studs. The attachment method will most likely vary
throughout the installation, and more than one of the
various methods outlined here will most likely be used.
Wood Stud
1. Use one 5/16" x 2-1/2" hex flange head lag bolt (C) and one
5/16" washer (D) through product and into pilot hole. (See
Figure 19) and (See Figure 25)
2. Repeat for remaining pilot holes.
Figure 19
Concrete or Concrete Block
1. Install one UX10X60R anchor (B) into each pilot hole using
a hammer, making sure that the anchor is flush with the wall.
(See Figure 20)
2. Use one 5/16" x 2-1/2" hex flange head lag bolt (C) and one
5/16" washer (D) through product into each anchor in wall.
(See Figure 20)
3. Repeat for remaining pilot holes.
Figure 20
Steel Stud
IMPORTANT ! : See Site Requirements for Steel Stud
Installation section before proceeding with Steel Studs
installation to ensure installation site meets requirements!
The drywall must have a minimum thickness of 1/2"!
1. Hold metal channel on anchor flat alongside plastic straps
and slide channel through hole. (See Figure 21)
Figure 21
2. Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 22)
3. Slide plastic cap on anchor towards wall until flange of cap
is flush with wall. (See Figure 22)
Figure 22
4. Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 23)
1
2
(C)
(D)
1
2
(C)
(B)
(D)
Drywall
Plastic straps
1
Plastic cap
Drywall
Anchor metal channel
3
Steel stud
(side view)
2
(if present)
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
14
Figure 23
5. Line up anchor with attachment point.
6. Insert 1/4-20 x 1-3/4" Phillips pan head screw through 1/4"
washer, corresponding mounting hole in wall bracket and
into anchor, and tighten until flush against wall bracket. DO
NOT over tighten! (See Figure 24)
Plastic straps
Drywall
Anchor metal channel
Plastic cap
4
Steel stud
(side view)
(if present)
Figure 24
Drywall
Anchor metal channel
Phillips
6
Steel stud
Washer
(side view)
Wall bracket
(if present)
screw
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
15
Site Requirements for Wood or Steel Stud Installation
Figure 25
FRONT
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" or 24" (on center) Studs
If back side of wall is unfinished,
to a minimum of one stud left
drywall must be installed
and right of the stud(s) being used
to install the mount. Drywall must be
secured to studs with screws a
maximum of 12" (305mm) apart
down center of stud.
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
(Both Sides of Stud)
[362 S 125 18, C-Shaped, S-Stud Section]
Plywood
3/4" minimum thickness
plywood covered
with drywall having
maximum thickness of 5/8"
5/8" maximum
drywall thickness
Stud
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
16
Configuration Examples
The following are just two examples of the many configurations which are possible with the PT Series wall mounts.
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
17
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
18
DIMENSIONS
TIL1X2PT
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
19
DIMENSIONS...cont’d
SLOTS
TIL1X3PT
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
20
DIMENSIONS...cont’d
SLOTS
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X4PT
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
21
DIMENSIONS...cont’d
3.50
88.9
0.81
20.6
1.25
31.8
KIT INCLUDES 2 BRACKETS
TILVABPT
DIMENSIONS: INCHES
[MILLIMETERS]
B
DETAIL B
SCALE 1 : 2
A 0.38
9.5
DETAIL A
SCALE 1 : 2
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
22
DIMENSIONS...cont’d
TiLED 3X3 CONFIGURATION
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
23
DIMENSIONS...cont’d
A
SCALE 1 : 3
CREATED USING FOUR TIL1X4PT
TiLED 4X4 CONFIGURATION
DIMENSIONS: INCHES
[MILLIMETERS]
TiLED 3X3 CONFIGURATION...cont’d
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
24
DIMENSIONS...cont’d
A
SCALE 1 : 3
TiLED 4X4 CONFIGURATION...cont’d
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
25
DIMENSIONS...cont’d
CREATED WITH THE FOLLOWING COMPONENTS
5-TIL1X3PT
5-TIL1X2PT
5-TILVABPT
DIMENSIONS: INCHES
[MILLIMETERS]
TiLED 5X5 CONFIGURATION
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
26
Installation Instructions TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT
27
TIL1X2PT / TIL1X3PT / TIL1X4PT / TILVABPT Installation Instructions
USA/International A 6436 City West Parkway, Eden Prairie, MN 55344
P800.582.6480 / 952.225.6000
F877.894.6918 / 952.894.6918
Europe A Franklinstraat 14, 6003 DK Weert, Netherlands
P+31 (0) 495 580 852
F+31 (0) 495 580 845
Asia Pacific A Office No. 918 on 9/F, Shatin Galleria
18-24 Shan Mei Street
Fotan, Shatin, Hong Kong
P852 2145 4099
F852 2145 4477
8800-003148 Rev02
2019 Legrand | AV
www.legrandav.com
02/2020