Chief TIL1X2IF User Manual
Displayed below is the user manual for TIL1X2IF by Chief which is a product in the Signage Display Mounts category. This manual has pages.
Related Manuals
INSTALLATION INSTRUCTIONS
TIL1X1IF
TIL1X2IF
TIL1X3IF TILVABIF
Hardware Kit
IFH Series LED Wall Mounts / Accessory
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
2
DISCLAIMER
Milestone AV Technologies and its affiliated corporations and
subsidiaries (collectively “Milestone”), intend to make this
manual accurate and complete. However, Milestone makes no
claim that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Milestone
makes no representation of warranty, expressed or implied,
regarding the information contained herein. Milestone assumes
no responsibility for accuracy, completeness or sufficiency of
the information contained in this document.
Chief® is a registered trademark of Milestone AV Technologies.
All rights reserved.
DEFINITIONS
MOUNTING SYSTEM: A MOUNTING SYSTEM is the
primary Chief product to which an accessory and/or component
is attached.
ACCESSORY: AN ACCESSORY is the secondary Chief
product which is attached to a primary Chief product, and may
have a component attached or setting on it.
COMPONENT: A COMPONENT is an audiovisual item
designed to be attached or resting on an accessory or mounting
system such as a video camera, CPU, screen, display,
projector, etc.
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voiding of factory warranty! It is the
installer’s responsibility to make sure all mounting systems
are properly assembled and installed using the instructions
provided.
WARNING: Failure to provide adequate structural strength
for this mounting system can result in serious personal injury
or damage to equipment! It is the installer’s responsibility to
make sure the structure to which this mounting system is
attached can support five times the combined weight of all
equipment. Reinforce the structure as required before
installing the mounting system. The wall to which the
mounting system / accessory is being attached may have a
maximum drywall thickness of 5/8” (1.6cm). Do not install
drywall anchors into the seam between drywall pieces.
WARNING: The TIL1X1IF / TIL1X2IF / TIL1X3IF LED wall
mounts are designed for use with the Samsung IFH Series
LED only. Exceeding the weight capacity (listed) can result in
serious personal injury or damage to equipment!
• TIL1X1IF: 20 lbs (9.1 kg);
• TIL1X2IF: 40 lbs (18.1 kg) - 20 lbs (9.1 kg) per
screen;
•TIL1X3IF: 60 lbs (27.2 kg) - 20 lbs (9.1 kg) per
screen.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a service center for
examination and repair.
WARNING: Do not use this mounting system outdoors.
IMPORTANT ! : The TIL1X1IF / TIL1X2IF /TIL1X3IF (IFH
Series) LED wall mounts are designed to be mounted to:
• a bare 8" concrete wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
• a 3/4" thickness plywood-backed, steel stud wall
covered with drywall having a maximum thickness of
5/8".
--SAVE THESE INSTRUCTIONS--
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
3
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips Screwdriver
Destornillador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Clé à fourche
By Hand
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
Hex-Head Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Zeskantsleutel
Clé à tête hexagonale
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Adjust
Ajustar
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Remove
Quitar
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Optional
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
4
TOOLS REQUIRED FOR INSTALLATION
PARTS
7/32"
#2
Level
[4+ ft. long]
[Small level]
Hardware Required - not included
(for installation into steel stud walls)
1. Chief brand FCAT1 Toggler Kit; OR
2. Hardware for installation to steel stud wall:
• 1/4-20 Toggler Snaptoggle BB (Qty 4)
•1/4-20 x 2-1/2" hex head bolt (Qty 4)
• 1/4" washer (Qty 4)
3/8"
1/2"
Mounting
A (4)
[Mounting button]
B (4)
M6 x 20mm
C (2)
10-24 x 5/8"
D (2)
1/4-20 x 1/2"
E (1)
8-32 x 1/2"
F (4)
5/16 x 2-1/2"
G (4)
UX10x60R
H (2)
[Installation washer]
J (4)
5/16"
Mounting
(Qty per bag)
Hardware Kit
(Qty per bag)
Button Kit
LED
(Qty per bag)
Mounting Kit
Vertical
Connector Kit
K (2)
[Vertical connector]
L (8)
1/4-20 x 1/2"
M (1)
[TIL1X1IF] N (1)
[TIL1X2IF] P (1)
[TIL1X3IF]
TILVABIF
(Qty per bag)
Mounting Kit
OR
OR
TIL1X1IF: 1 bag
TIL1X2IF: 2 bags
TIL1X3IF: 3 bags
TIL1X1IF: 1 bag
TIL1X2IF: 2 bags
TIL1X3IF: 3 bags
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
5
INSTALLATION
Preinstallation
IMPORTANT ! : Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED screens.
CAUTION: Handle the LED screens with care, being
careful to not impact or drop the LED screen.
CAUTION: There is a magnetic surface on the front of the
LED screen. To prevent damage ensure that no metallic
object is pulled onto the LED screen.
NOTE: When planning the installation, remember that cabling
of the LED screens should be completed during the
installation process.
Preparing LED Screen
NOTE: If mounting buttons are already installed to your LED
screen, proceed to Determining Installation Site
section.
1. Attach four mounting buttons (A), one to each corner of LED
screen, with four M6 x 20mm Phillips pan head screws (B).
(See Figure 1)
Figure 1
Determining Installation Site
IMPORTANT ! :
The top of the LED screen is 3-1/2"
above the center line of the mounting slots. (See Figure 2)
1. Determine location for the top left corner of the LED wall.
(See Figure 2)
2. Make a mark 3-1/2" below the planned top left corner of the
LED wall. (See Figure 2)
3. Using a level, mark a horizontal line across width of LED
wall from the mark made in Step 2.
NOTE:
This line will indicate the center line of the mounting slots
for the top mount(s) in the video wall. (See Figure 2) and
(See Figure 3)
Figure 2
Figure 3
1
(A x 4)
(B x 4)
LED screen
Location for top left corner of LED wall
1
2
3.5"
3
3.5”
3.5”
[TIL1X1IF shown as example]
3
Mounting slot
center line
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
6
Installing First Mount
The TIL1X1IF / TIL1X2IF /TIL1X3IF (IFH Series) LED wall
mounts are designed to be mounted to:
• a bare 8" concrete wall; or
• a 3/4" thickness plywood-backed, 2" x 4" wood studs
(16" on center minimum) wall with a maximum drywall
thickness of 5/8"; or
• a 3/4" thickness plywood-backed, steel stud wall covered
with drywall having a maximum thickness of 5/8".
Table 1: Fastener Information
1. Hold furthest left, top wall mount against wall ensuring that
mounting slot is lined up with center line marked on the wall
in Determining Installation Site section. Double-check
with a level. (See Figure 4)
2. Mark mounting holes in two top mounting slots along the
horizontal line marked in Step 3. (See Figure 4)
NOTE: The mounting holes are 14" apart. (See Figure 4)
Figure 4
3. Drill two pilot holes (see Table 1 for size) at each location
marked in Step 2 (See Figure 4) and follow fastener
information (appropriate for wall type) located in Table 1.
IMPORTANT ! : Refer to Fastener Installation Methods
(located in Appendix at end of Installation Instructions)
for details on installing product into various wall types.
4. Partially install two fasteners into wall, but do NOT
completely tighten to wall. (See Figure 5)
Figure 5
5. Hang wall mount, aligning upper teardrop slots over
fasteners, and adjust side-to-side for proper location. (See
Figure 5)
NOTE: The horizontal slots located along the vertical mount
pieces are the center-of-screen indicators to illustrate
where the center of each LED screen will be located.
(See Figure 5)
6. Lay levels across flat of the mounting holes and center-of-
screen indicators, and vertically along side of mount to
ensure wall mount is square and level. (See Figure 6)
7. Slide installation washers (H) behind head of fasteners and
tighten mount in place. (See Figure 6)
Figure 6
WALL
TYPE PILOT
HOLE FASTENERS (see PARTS
drawing)
Drywall
attached to
plywood-
backed walls
/Steel studs
Drywall
attached to
plywood-
backed walls
/Wood studs
1/2"
7/32" x 3"
- 1/4-20 x 2-1/2" hex head lag (not
included)
- 1/4" washer (not included)
- 1/4-20 Toggler Snaptoggle BB
(not included)
- 5/16 x 2-1/2" flanged hex head
lag (F)
- 5/16" washer (J)
- Installation washer (H)
Concrete
3/8" x 3" - 5/16 x 2-1/2" flanged hex head
lag (F)
- 5/16" washer (J)
- Installation washer (H)
- Fischer Anchor UX10x60R (G)
2
14 inches
3
4
5
Center-of-screen
indicators
(examples)
x 2
Level placed
across flat of
mounting holes
Level along
side of
mount
Level placed along
center-of-screen
indicators
6
6
6
7
(H) x 2
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
7
8. Drill lower pilot holes (see Table 1 for size) at attachment
locations and follow fastener information (appropriate for
wall type) located in Table 1. (See Figure 7)
9. Install two fasteners through lower part of mount and
tighten. (See Figure 7)
Figure 7
10. (OPTIONAL) If more LED screens need to be added to the
screen configuration, add TILVABIF vertical connector kit to
top or bottom of wall mount. If you are NOT adding the
TILVABIF connector kit, proceed to Step 11.
• Add the vertical connector (K) to the top or bottom of
the mount, and fasten with two 1/4-20 x 1/2" Phillips
head screws (L) per vertical connector. (See Figure 8)
• Connect another wall mount to the other end of the
vertical connector to lengthen the video wall.
Figure 8
11. Using a level on the front of the mount in various places,
adjust the leveling feet on the mount until the mount is
plumb. (See Figure 9)
Figure 9
9
x 2
8
x 2
10
(K)
(L) x 4
(K)
Leveling feet
locations
11
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
8
12. Install one 8-32 x 1/2" Phillips tapping screw (E) into left side
of mount immediately below lower left mounting button hole
for each LED screen space. (See Figure 10)
IMPORTANT ! : The tapping screws keep the LED
screens centered on the mount, and are ONLY installed
on the furthest left column of mounts.
NOTE: Using a drill driver makes installation of the tapping
screws (E) easier.
Figure 10
Adding Additional Mounts
1. Partially install two 1/4-20 x 1/2" Phillips head screws (D) into
each side block on the right side of mount. (See Figure 11)
Figure 11
2. Hang the second mount (using teardrop slots on the left side)
onto the fasteners installed into the mount already attached
to the wall, and snug up the fasteners. (See Figure 12)
Figure 12
Model Fastener
Qty
TIL1X3IF 3
TIL1X2IF 2
TIL1X1IF 1
12
(E)
[TIL1X3IF shown as example]
Model Fastener
Qty
TIL1X3IF 6
TIL1X2IF 4
TIL1X1IF 2
1
(D)
[TIL1X3IF shown as example]
Side
block
2
5
(D) x 6 Second
wall mount
Teardrop slots
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
9
3. Use a level to align the second mount with the first mount.
(See Figure 13)
4. Use a level across the front of the two mounts, and adjust
the leveling feet on the second mount so that it matches the
plumb of the first mount. (See Figure 13)
Figure 13
5. Tighten all fasteners (where the second mount is hung on the
first mount) to fasten two mounts together. (See Figure 12)
6. Drill pilot holes in the mounting slots and fasten the second
wall mount to the wall following the same steps as used for
the first wall mount. (See Figure 13)
7. Recheck the alignment and overall flatness of the wall
mounts during the installation process.
8. Continue the installation process until all wall mounts are
attached.
9. OPTIONAL: You may loosely install one 10-24 x 5/8"
Phillips head screw (C) into right side of mount at each
mounting button hole for each LED screen space. (See
Figure 14) These fasteners may be helpful if it’s necessary
to make slight horizontal adjustments of LED screens.
Figure 14
6
Leveling
feet adjust
Leveling feet
(behind level)
4
4
x 2
6
x 2
3
9
(D)
Model Maximum
Fastener
Qty
TIL1X3IF 6
TIL1X2IF 4
TIL1X1IF 2
[TIL1X3IF shown as example]
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
10
Installing LED Screens
IMPORTANT ! : Reference the LED screen installation
manual for specific instructions regarding care, handling,
cabling and installation of the LED screens.
NOTE: Begin the installation of LED screens in the lower left
corner of the video wall.
NOTE: One complete column of LED screens should be
installed before proceeding to the next column.
NOTE: When planning the installation, remember that cabling
of the LED screens should be completed during the
installation process.
NOTE: Both the power and signal cables may be placed down
both sides of the mount, or behind the mount
(depending on depth from wall).
1. Install the first LED screen in the lowest left-hand corner of
the video wall by aligning mounting buttons on the LED
screen with the mounting holes on the wall mount.
2. Move LED screen forward until all four mounting buttons are
through mounting holes in wall mount.
3. Lower display until contacting the bottom of mounting holes.
(See Figure 15)
4. Continue with the next LED screen (directly above installed
screen).
NOTE: Be sure to check the level and plumb of the screens
occasionally during the LED screen installation.
5. Make sure the alignment pins in the top and bottom of the
screens align with each other.
6. AFTER the entire first column of LED screens are installed,
slide the column to the left side so that the mounting buttons
are against the tapping screws, and to allow clearance for
installation of the second column.
7. After the second column is installed, push to the left until the
first and second columns of LED screens are touching.
8. Repeat until all LED screens are installed.
Figure 15
Adjustments
Depth Adjust
The depth of each wall mount section is controlled by the
leveling feet.
1. Loosen or tighten the leveling feet adjust bolt to assist in
leveling the LED screens across the various wall mounts.
(See Figure 16)
Figure 16
Horizontal LED Screen Adjust
1. You may loosely install one 10-24 x 5/8" Phillips head screw
(C) into right side of each mount at mounting button hole(s).
Loosening or tightening the fasteners makes slight horizontal
adjustments of LED screens. (See Figure 17)
Figure 17
2
Leveling feet
locations
1
Adjust bolt
1
(C)
NOTE: If horizontal
adjustment of the LED
screens is required, one
or two fasteners may be
used per LED screen.
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
11
Fastener Installation Methods
IMPORTANT ! : See Table 1 for appropriate hardware
and pilot hole sizes for various wall types.
IMPORTANT ! : The expanse of the LED wall will most
likely mean that attachment of the wall mounts will not all
be in studs. The attachment method will most likely vary
throughout the installation, and more than one of the
various methods outlined here will most likely be used.
Wood Stud
1. Use one 5/16" x 2-1/2" hex flange head lag bolt (F) and one
5/16" washer (J) through product and into pilot hole. (See
Figure 18)
2. Repeat for remaining pilot holes.
Figure 18
Concrete
1. Install one UX10X60R anchor (G) into each pilot hole using
a hammer, making sure that the anchor is flush with the wall.
(See Figure 19)
2. Use one 5/16" x 2-1/2" hex flange head lag bolt (F) and one
5/16" washer (J) through product into each anchor in wall.
(See Figure 19)
3. Repeat for remaining pilot holes.
Figure 19
Steel Stud
IMPORTANT ! : See Site Requirements for Steel Stud
Installation section before proceeding with Steel Studs
installation to ensure installation site meets requirements!
The drywall must have a minimum thickness of 1/2"!
1. Hold metal channel on anchor flat alongside plastic straps
and slide channel through hole. (See Figure 20)
Figure 20
2. Holding plastic straps on anchor, pull anchor away from wall
until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 21)
3. Slide plastic cap on anchor towards wall until flange of cap
is flush with wall. (See Figure 21)
Figure 21
4. Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 22)
Figure 22
1
2
(F)
(J)
1
2
(F)
(G)
(J)
Drywall
Plastic straps
1
Plastic cap
Drywall
Anchor metal channel
3
Steel stud
(side view)
2
(if present)
Plastic straps
Drywall
Anchor metal channel
Plastic cap
4
Steel stud
(side view)
(if present)
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
12
5. Line up anchor with attachment point.
6. Insert 1/4-20 x 1-3/4" Phillips pan head screw through 1/4"
washer, corresponding mounting hole in wall bracket and
into anchor, and tighten until flush against wall bracket. DO
NOT over tighten! (See Figure 23)
Figure 23
Drywall
Anchor metal channel
Phillips
6
Steel stud
Washer
(side view)
Wall bracket
(if present)
screw
Site Requirements for Steel Stud Installation
Figure 24
FRONT
There must be a minimum of
1-7/8" (48mm) clearance
inside wall
16" or 24" (on center) Studs
If back side of wall is unfinished,
to a minimum of one stud left
drywall must be installed
and right of the stud(s) being used
to install the mount. Drywall must be
secured to studs with screws a
maximum of 12" (305mm) apart
down center of stud.
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
(Both Sides of Stud)
[362 S 125 18, C-Shaped, S-Stud Section]
Plywood
3/4" minimum thickness
plywood covered
with drywall having
maximum thickness of 5/8"
5/8" maximum
drywall thickness
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
13
Configuration Examples
The following are just two examples of the many configurations which are possible with the IFH Series wall mounts.
3X3 with Open Center
"Snake" Configuration
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
14
DIMENSIONS
21.01
533.7
18.79
477.3
18.98
482.1
3.37
85.7
14.00
355.6
2.00
50.8
0.34
8.7
13.51
343.2
2.36
60.1
6.00
152.4
6.01
152.7
6.00
152.4
INDIVIDUAL FOOT
DEPTH ADJUSTMENT
2.29
58.3
3.29
83.7
MAXIMUM
DEPTH
0.88
22.2
0.38
9.5
MINIMUM
DEPTH
MINIMUM
DEPTH MAXIMUM
DEPTH
TIL1X1IF
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
15
DIMENSIONS...cont’d
6.00
152.4
14.00
355.6
3.37
85.7 2.36
60.1
18.79
477.3
18.98
482.1
34.77
883.2
42.27
1073.7
6.00
152.4
27.27
692.7
0.34
8.7
2.00
50.8
INDIVIDUAL
FOOT DEPTH
ADJUSTMENT
2.29
58.3
0.88
22.2
0.38
9.5
3.29
83.7
MINIMUM
DEPTH MAXIMUM
DEPTH
MINIMUM
DEPTH MAXIMUM
DEPTH
TIL1X2IF
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
16
DIMENSIONS...cont’d
18.98
482.1
18.79
477.3
2.36
60.1
14.00
355.6
3.38
85.7
63.53
1613.7
2.00
50.8
0.34
8.7
6.00
152.4
48.53
1232.7
6.00
152.4
56.03
1423.2
INDIVIDUAL
FOOT DEPTH
ADJUSTMENT
2.29
58.3
0.88
22.2
0.38
9.5
3.29
83.7
MINIMUM
DEPTH MAXIMUM
DEPTH
MINIMUM
DEPTH
MAXIMUM
DEPTH
DIMENSIONS: INCHES
[MILLIMETERS]
TIL1X3IF
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
17
DIMENSIONS...cont’d
4.91
124.7
0.37
9.5
1.00
25.4
2.91
73.9
3.91
99.3
1.46
37.0
1.22
31.0
LED MOUNTS
SOLD SE PARATELY
A
DETAIL A
SCALE 1 : 4
KIT IN CLUDES
2 BRACKETS
TILVABIF
DIMENSIONS: INCHES
[MILLIMETERS]
Installation Instructions TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF
18
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
19
TIL1X1IF / TIL1X2IF / TIL1X3IF / TILVABIF Installation Instructions
USA/International A 6436 City West Parkway, Eden Prairie, MN 55344
P800.582.6480 / 952.225.6000
F877.894.6918 / 952.894.6918
Europe A Franklinstraat 14, 6003 DK Weert, Netherlands
P+31 (0) 495 580 852
F+31 (0) 495 580 845
Asia Pacific A Office No. 918 on 9/F, Shatin Galleria
18-24 Shan Mei Street
Fotan, Shatin, Hong Kong
P852 2145 4099
F852 2145 4477
Chief, a products division of
Milestone AV Technologies
8800-003099 Rev00
2018 Milestone AV Technologies
www.milestone.com
09/18